June 19, 2014

16 UTILITY QUESTIONS TO ANSWER DURING YOUR BUILDING PROJECT

by Star Building Systems

16 UTILITY QUESTIONS TO ANSWER DURING YOUR BUILDING PROJECT

Electricity has been giving people a thrill since Benjamin Franklin got a hankering one night to fly a kite. He got excited about his discovery and we’ve been excited with him ever since. We need electricity to power our building projects, along with water and gas and a faultless sanitation system. That’s what we think about when we think about utility requirements for our building project, but are we missing something? Or even several somethings? Are the basic utility requirements all we need to consider? And have we considered all the areas they affect? Since utilities are so crucial to, not only the success of the project, but the continued usage of the building, here are a few utility questions to help you cover all your bases:

  1. Is temporary power available during construction?
  2. What are the building’s power requirements?
  3. Are existing power sources adequate for peak operation?
  4. What is needed with regard to:
    1. Gas mains?
    2. Water mains?
    3. Anti-pollution devices?
    4. Storm sewer drainage?
    5. Trenching and backfill requirements for all underground lines?
    6. Sanitary pits?
    7. Sanitary sewer?
    8. Overhead sprinkler?
  5. Will existing power and/or telephone lines need to be relocated?
  6. Will there be an illuminated sign?
  7. Is there any need for flood lighting in outside areas?
  8. Have the following areas been included:
    1. Parking lot lighting?
    2. Other needed exterior lighting on grounds?
    3. Lighted exit signs (required by OSHA)?
  9. Have all interior wiring requirements been considered for the:
    1. Lunch room?
    2. Restrooms?
    3. Janitor’s room?
    4. Computer requirements?
    5. Business equipment requirements?
    6. Other?
  10. Are electrical outlets sufficient for whatever is needed and conveniently placed?
  11. Do meters, transformers, circuit breakers, and sub-panels have proper capacity for future mechanical needs?
  12. What are illumination requirements for:
    1. Foot-candles in plant areas?
    2. In office area?
    3. At each work station?
    4. In warehouse area?
  13. What are the requirements for:
    1. Heating?
    2. Ventilation?
    3. Air conditioning?
  14. Will there be requirements for:
    1. Elevators?
    2. Escalators?
  15. What about waste disposal?
    1. Incinerator?
    2. Dispose-all?
    3. Trash area/bins?
    4. Other?
  16. Are there requirements for:
    1. Special anti-pollution devices?
    2. Fire/burglar alarm system?
    3. Public address system?
    4. Internal music system?

Make sure to check out the other blogs in this question series. We cover the questions to answer when:

We ask. You answer. It’s pretty nifty. If you have any questions, ask away! Leave them in the comments section and we’ll give you our best answers. You ask. We answer. Again with the “nifty.”

Join Our Winning Team

Become part of the powerful Star network. We invest in builders who understand the value of results and provide support that develops strong relationships between you and the entire Star team.

Find An Authorized Builder

Your building is the cornerstone of the community where people live, work and play. Find a local Star Authorized Builder and let us help you bring your vision to life.